Buffalo Pound Non-Potable Water Supply System – North Intake Pump Station
Alliance Energy provided the electrical construction of a new 138KV electrical substation yard as well as the supply and installation of two 10 MVA 72/138KV-4160 volt power transformers for normal utility power to the renovated water treatment plant which serves treated water to the city of Regina, Moose Jaw and the surrounding areas. The project also included the supply and installation of three new 2000 KW diesel generators and required interface power and control panels to ensure emergency backup power to the treatment plant should the normal utility power for the facility ever fail.
Project Details
Location: Buffalo Pound Lake North
General Contractor: Westridge Construction Ltd.
Electrical Engineer: Associated Engineering
Electrial Budget: $2,500,000