Buffalo Pound Water Treatment Plant

Buffalo Pound Water Treatment Plant

Buffalo Pound Lake Pump Station Renewal

Alliance Energy provided the electrical construction of a new 138KV electrical substation yard as well as the supply and installation of two 10 MVA 72/138KV-4160 volt power transformers for normal utility power to the renovated water treatment  plant which serves treated water to the city of Regina, Moose Jaw and the surrounding areas. The project also included  the supply and installation of three new 2000 KW diesel generators and required interface power and  control panels  to  ensure emergency backup power to the treatment plant should the normal utility power for the  facility ever fail.

Location: Buffalo Pound, SK
General Contractor: Westridge Construction Ltd.
Electrical Engineer: KGS Group
Electrical Budget: $12,000,000

Buffalo Pound Electrical Substation

This project involved the construction of a new 138V electrical substation yard as well as the installation of 2 new owner supplied 72/138KV-4160 volt power transformers.

Location: Buffalo Pound, SK
General Contractor: Westridge Construction Ltd.
Electrical Engineer: KGS Group
Electrical Budget: $9,000,000

Buffalo Pound Supply Line Upgrade

The project involved the replacement of 1 – 60 horsepower pump and 3 – 200 horsepower pumps in the 1955 and 1999 pump rooms.

Location: Buffalo Pound, SK
General Contractor: Westridge Construction Ltd.
Electrical Engineer: KGS Group
Electrical Budget: $1,200,000

Project Details

Location: Buffalo Pound, SK
General Contractor: Westridge Construction Ltd.
Electrical Engineer: KGS Group
Electrial Budget: $22,200,000 (combined)

Awards